Cruise Industry News looks into key drydock projects taking place in November, from major refurbishments to modernization projects.
Celebrity Beyond
Cruise Line: Celebrity Cruises
Capacity: 3,260 guests
Tonnage: 141,200
Year built: 2022
Drydock Period: November 1 to November 18, 2026
Shipyard: Grand Bahama Shipyard (Freeport, the Bahamas)
The Celebrity Beyond recently underwent a drydock at the Grand Bahama Shipyard in Freeport.
In addition to undergoing technical maintenance, the vessel introduced new features during the shipyard stay, including a refreshed pool deck and new dining venues.
The Edge-class ship welcomed guests back on November 18, kicking off a winter season sailing to the Caribbean from Port Everglades.
Carnival Luminosa
Cruise Line: Carnival Cruise Line
Capacity: 2,260 guests
Tonnage: 92,720
Year built: 2009
Drydock Period: October to November, 2026
Shipyard: Seatrium Tuas Boulevard Yard (Singapore)
The Carnival Luminosa recently resumed service after undergoing an 18-day drydock at the Seatrium Tuas Boulevard Yard in Singapore.
As reported by Cruise Industry News, the 2009-built vessel welcomed guests back with a series of enhancements, including new gaming machines in its casino, a brand-new Effy Jewelry store and a revitalized video arcade.
The ship also underwent technical maintenance and class inspections before kicking off a repositioning voyage ahead of its winter season in Australia and the South Pacific.
AIDAmar
Cruise Line: AIDA Cruises
Capacity: 2,174 guests
Tonnage: 88,000
Year built: 2012
Drydock Period: November 1 to December 20, 2026
Shipyard: Chantier Naval de Marseille (Marseille, France)
The AIDAmar is undergoing a major refurbishment as part of the AIDA Evolution fleet modernization program.
As the third ship to be revitalized as part of the initiative, the 2012-built vessel entered a drydock at the Chantier Naval de Marseille on November 1, 2026.
Before welcoming guests back in late December, the ship will introduce updated technical equipment, as well as refreshed interiors, upgraded cabins and new venues.
Crystal Serenity
Cruise Line: Crystal Cruises
Capacity: 740 guests
Tonnage: 68,870
Year built: 2003
Drydock Period: October 19 to November 9, 2026
Shipyard: Lisnave (Setúbal, Portugal)
The Crystal Serenity recently underwent a three-week drydock at the Lisnave shipyard in Setúbal, Portugal.
The project focused on refining the onboard experience and included updates to the vessel’s Atrium and Crystal Cove, which were refreshed with a modern layout and additional seating.
Other areas undergoing updates included the pool deck, the Waterside Restaurant, the Stardust Club, the Seahorse Pool and the Marketplace.
Amadea
Cruise Line: Phoenix Reisen
Capacity: 600 guests
Tonnage: 29,000
Year built: 1991
Drydock Period: November 6 to November 20, 2026
Shipyard: Lloyd Werft (Bremerhaven, Germany)
The Amadea is undergoing a modernization project at the Lloyd Werft shipyard in Bremerhaven, Germany.
According to Phoenix Reisen, the project is highlighted by technical enhancements, with initiatives aimed at improving operational reliability and energy efficiency.
The 29,000-ton vessel is also undergoing guest-facing changes, including the extension of the Copernicus Bar, an extensive renovation of its show lounge and a redesign of the Vista Lounge.
