Skip to content
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
X-twitter Facebook Linkedin
cin header 2025
Cruise Industry News Logo
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE

Avoiding Long Lead Times That Can Hamper Refit Projects

  • October 9, 2020

Loading Materials

“Modernization projects are known for being fast-paced and deadline-sensitive,” said Tommi Virta, project manager at the ALMACO Group. “Delays due to materials with long lead times are not uncommon, but there are ways to work around them and minimize the risk and damage.”

While a newbuilding project follows a set schedule, drydocks and refurbishments are not always traditional, said Virta.

“It is often necessary to start planning and preparing already during the sales and quotation process. The reason for this is the short preparation time, and long material lead times. In other words, we sometimes need to order certain materials before we even have a contract, but almost always order certain materials before we have any completed official design available,” he said.

Of note, wall panels can be some of the toughest materials to source quickly due to foil ordering requirements and long lead times.

Other items that present long lead times when it comes to sourcing products are wallpapers, fabrics laminates, doors, fixed furniture and wet units.

“There aren’t many modular wet unit manufacturers globally, and they have all been dealing with full orderbooks lately,” Virta explained. “In a project where we need to design a new wet unit, the lead time can be very long, and we often need to revise the PO with the wet unit manufacturer when the design is completed. These can easily have 12 weeks lead time.”

Contractors can run the risk of not getting materials to the ship or drydock on time.

“If you are aware of potential problem already during the quotation phase, highlight it to the customer,” advised Virta. “Propose alternatives if you realize that some of the materials are impossible to get already before the quotation. During the design phase, you can make the problem transparent to the customer’s designers and tackle the long lead time items with improvised design methods in a more agile way. Also, make sure to set exact critical path dates for each material and stick to that plan.”

 

Cruise Industry News Email Alerts
 
 

 

  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  1. Cruise Industry News
  2. Cruise News
  3. Avoiding Long Lead Times That Can Hamper Refit Projects
EMAIL NEWSLETTER

Get the latest breaking cruise news. Sign up.

CRUISE SHIP ORDERBOOK

84 Ships | 229,384 Berths | $89 Billion | View

Drydock Report
2026 Drydock Report

Highlights:

  • Full Overview
  • Record Refit Year
  • 26-27-28 Schedule
  • PDF Download
  • Order Today
2026 Executive Guide
2026 Executive Guide

Highlights:

  • All Brands
  • Decision Makers
  • Contact Info
  • Brand Background 
  • Instant Download
  • Order Today
Cruise Industry News
  • Advertising
  • About
  • Contact
Online News
  • Cruise News
  • Feature Magazine Articles
  • Orderbook
  • Events
Publications
  • Quarterly Magazine
  • Annual Report
  • Email Newsletter
  • Executive Guide
  • Digital Reports
Connect
  • Search
  • Facebook
  • Twitter
  • LinkedIn
© Cruise Industry News 1996-2026. All Rights Reserved.