Skip to content
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
Twitter Facebook Linkedin
cin header 2025
Cruise Industry News Logo
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE

Port Everglades Completes Shore Power Master Plan

  • February 6, 2023
Port Everglades

Port Everglades recently completed a study to add shore power to the Port’s eight cruise terminals and has taken delivery of the final report, according to a press release.

The study was performed by Moffatt & Nichol, a global infrastructure advisory firm working in cooperation with Florida Power & Light (FPL), Carnival Corporation, Disney Cruise Line, and the Royal Caribbean Group.

The port said that this comprehensive analysis assessed the capacity of the existing electrical grid and identified the necessary infrastructure upgrades required to deliver shore power to the diverse cruise ships calling Port Everglades. The recommended plan is capable of delivering up to 16 megawatts of electricity simultaneously to each of the eight terminals in accordance with IEC/IEEE 80005 standards.

“Shore power, it’s a ‘shocking’ project because we have been exploring the possibilities of electrification since 2009 when we built Terminal 18 to homeport the largest cruise ships in the world,” said CEO and Port Director Jonathan Daniels. “This technology speaks to our core values of strength, resiliency and sustainability. We are ready to harness this alternative for the good of our partners and our community.”

To align with Broward County climate change goals, Port Everglades is advancing initiatives to reduce greenhouse gas emissions, including installation of shore power infrastructure. Engine exhaust gases from cruise ships running on-board power plants while docked are contributors to air emissions. Shore power infrastructure enables ships to turn off their engines and connect to the local electric power grid. Full implementation of this shore power and electrification initiative is projected to eliminate 11,366 metric tons of CO2 while reducing NOx and SO2 emissions by 75% and 51%, respectively. This is equivalent to taking 2,470 cars off the road annually. The electricity will be generated by FPL using a variety of energy sources, including natural gas, nuclear, solar, and wind.

The estimated cost for the project, including the estimated cost of FPL supply and distribution system upgrades, is approximately $20 million per cruise terminal, for a total cost of $160 million. The project is expected to be financed through federal and state grant funds, contributions from FPL, the participating cruise lines, and the County. Implementation will occur in phases. The earliest construction could occur is mid-2024 with all phases completed by the end of 2027.

Cruise Industry News Email Alerts
 
 

 

  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  1. Cruise Industry News
  2. Cruise News
  3. Port Everglades Completes Shore Power Master Plan
EMAIL NEWSLETTER

Get the latest breaking cruise news. Sign up.

CRUISE SHIP ORDERBOOK

84 Ships | 229,384 Berths | $89 Billion | View

Drydock Report
2026 Drydock Report

Highlights:

  • Full Overview
  • Record Refit Year
  • 26-27-28 Schedule
  • PDF Download
  • Order Today
2026 Executive Guide
2026 Executive Guide

Highlights:

  • All Brands
  • Decision Makers
  • Contact Info
  • Brand Background 
  • Instant Download
  • Order Today
Cruise Industry News
  • Advertising
  • About
  • Contact
Online News
  • Cruise News
  • Feature Magazine Articles
  • Orderbook
  • Events
Publications
  • Quarterly Magazine
  • Annual Report
  • Email Newsletter
  • Executive Guide
  • Digital Reports
Connect
  • Search
  • Facebook
  • Twitter
  • LinkedIn
© Cruise Industry News 1996-2026. All Rights Reserved.