Carnival Cruise Line’s New Mardi Gras Docks in Rotterdam for First LNG Refueling

Mardi Gras in Rotterdam

Carnival Cruise Line’s new Mardi Gras made its first port call this morning in Rotterdam, The Netherlands, where the ship will refuel with Liquefied Natural Gas (LNG) for the first time after delivery.

The Mardi Gras, set to begin sailing from Port Canaveral, Fla., next year, will be the first cruise ship in the Americas to be powered by LNG, making history. 

Carnival said the Mardi Gras is equipped with four medium speed LNG engines that will be run in port and at sea. The ship can operate for two weeks between refuelings, which will happen in Port Canaveral. 

The Mardi Gras, which was delivered to Carnival last week at the Meyer Turku shipyard in Finland, is scheduled to depart Rotterdam tomorrow and then sail to Barcelona, Spain, before making its eventual arrival in the U.S.  The ship’s inaugural voyage from Port Canaveral is scheduled for April 24, 2021.

Cruise Industry News Email Alerts

 

EMAIL NEWSLETTER

Get the latest breaking cruise newsSign up.

CRUISE SHIP ORDERBOOK

93 Ships | 229,512 Berths | $90 Billion | View

Drydock Report

Highlights:

  • Full Overview
  • Record Refit Year
  • 26-27-28 Schedule
  • PDF Download
  • Order Today
2026 Executive Guide

Highlights:

  • All Brands
  • Decision Makers
  • Contact Info
  • Brand Background 
  • Instant Download
  • Order Today