Skip to content
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
  • Home
  • Search
  • Expedition Report
  • River Report
  • Orderbook
  • Research
  • About Us
  • Email News
  • Advertise
  • Store
  • Contact
X-twitter Facebook Linkedin
cin header 2025
Cruise Industry News Logo
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE
  • Home
  • Cruise News
    • Cruise News Index
    • Email Alerts | E-Newsletter
    • Cruise Ship Orderbook
    • Ship Sales and Transfers
    • Search
    • Trade Shows and Events
    • PDF Resources
    • Historical Data
  • Quarterly Magazine
    • Quarterly Magazine
    • Feature Magazine Articles
    • Subscribe
  • 2026 Annual Report
    • 2026 Annual Report
    • River Report
    • Full Product Package
  • 2026 Executive Guide
    • 2026 Executive Guide
  • Digital Reports
    • Euro River Market Report
    • Global Cruise Ship Index
    • Expedition Market Report
    • Riverboat Index
    • Secondhand Market
    • Luxury Market Report
    • Drydocking and Refurb
    • Orderbook Capacity Data
    • China Market Report
    • Full Product Package
  • SUBSCRIBE

Metso to Upgrade Automation for Stena Germanica

  • January 7, 2015

Metso has been awarded a contract to upgrade and expand the ship automation of the Stena Germanica, a RoPax vessel owned by Stena Line, one of the world’s largest ferry operators. Metso’s contractual partner is Gdansk Ship Repair Yard Remontowa S.A.

Stena will have the vessel’s main engines converted to run on methanol and marine gas oil as a dual-fuel concept. The project is to prove and showcase methanol as an innovative, safe and sustainable fuel for shipping, which consequently lowers the vessel’s SOx and particulate emissions.
Metso will integrate the related control and monitoring functionalities within the vessel’s automation system. The scope includes a new redundant process controller, I/O system and eight new data communication lines to the main engines’ control system and methanol fuel pumps. The advanced automation solutions will allow the vessel to efficiently control the fuel plant and meet the new exhaust gas emission regulations set forth by IMO and the European Union.

The delivery also includes an upgrade of the existing Damatic XD automation system installed when the vessel was built in 2001. The control room stations and related communication network will be upgraded to the latest version of Metso DNA automation technology. Also included is an DNA Trend & Event Archive with tools for analyzing process values and events. Additionally, the main engines’ remote control system will be modernized with two new redundant process controllers, an I/O system and two dedicated touch screen user interfaces.

“Making life-cycle upgrades with our technology is simple. There is no need to change everything; we can update only the life-cycle critical parts and enable the system operators to work efficiently with the newest version of the DNA user interface,” said Per Syvertsen, senior technical manager, Marine Automation Applications, Metso.

Delivery will take place in the first quarter of 2015.

The Stena Germanica was lengthened in 2007 and upgraded in 2010. The vessel is 241 meters long, 29 meters wide and has a gross tonnage of 51,837 and 3,907 lane meters. There is accommodation capacity for 1,300 passengers. She sails between Gothenburg and Kiel.

Other recent Metso automation installations include Royal Caribbean’s Quantum of the Seas.

 
 

 

Cruise Industry News Email Alerts
 
 

 

  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  • Cruise News
  • Magazine Subscription
  • Email Newsletter
  • Search
  1. Cruise Industry News
  2. Cruise News
  3. Metso to Upgrade Automation for Stena Germanica
EMAIL NEWSLETTER

Get the latest breaking cruise news. Sign up.

CRUISE SHIP ORDERBOOK

84 Ships | 229,384 Berths | $89 Billion | View

Drydock Report
2026 Drydock Report

Highlights:

  • Full Overview
  • Record Refit Year
  • 26-27-28 Schedule
  • PDF Download
  • Order Today
2026 Executive Guide
2026 Executive Guide

Highlights:

  • All Brands
  • Decision Makers
  • Contact Info
  • Brand Background 
  • Instant Download
  • Order Today
Cruise Industry News
  • Advertising
  • About
  • Contact
Online News
  • Cruise News
  • Feature Magazine Articles
  • Orderbook
  • Events
Publications
  • Quarterly Magazine
  • Annual Report
  • Email Newsletter
  • Executive Guide
  • Digital Reports
Connect
  • Search
  • Facebook
  • Twitter
  • LinkedIn
© Cruise Industry News 1996-2026. All Rights Reserved.