The Port of Bilbao has closed a deal for the building of a new cruise terminal, at a reported cost of 13.8 million Euros.
The terminal, located at Getxo, will take 16 months to build and work is scheduled to start at the end of summer in the Spanish port.
The new facility will be just a short distance from the existing terminal, and offer 355 meters of berthing with 12 meters of water depth.